The Tivoli Theatre Foundation's ambitious project to merge the Tivoli Theatre and the Fowler Building into the Tivoli Centre has been a rollercoaster ride, with its fair share of challenges and triumphs. One of the most memorable low points was the discovery of a capped-off water line during the restoration process, which led to a temporary lake along Seventh Street. This incident, while seemingly apropos given the Roman theme of the Tivoli, was a significant setback. However, it was a learning experience, highlighting the importance of thorough planning and the unexpected challenges that can arise during restoration.
The project, valued at $75 million, has been a meticulous process, with a focus on preserving the historic elements of both buildings. The Tivoli section is set to open for a Billy Strings concert on October 20th, with most sections of the Fowler Building expected to be ready by the end of December. The project has been a careful balance of modern upgrades and historical preservation, with some sections left temporarily unfinished as part of the "value engineering" process.
One of the most intriguing discoveries was an uncovered steel spiral staircase, which will be put back into use, leading to a rooftop bar with views of Chattanooga's iconic buildings. This addition not only enhances the functionality of the space but also provides a unique architectural feature. The project has also included the restoration of the stage area, featuring all-new red seats, and the addition of a Patrons Lounge, a year-round restaurant, and the Bobby Stone Theatre, which will showcase independent films and serve as a flex event space.
The Tivoli's signature marquee, dating back to the 1950s or 1960s, will be completely refurbished, with an LED board installed to replace the manual message-changing process. This upgrade not only modernizes the entrance but also ensures that the marquee remains a prominent feature of the theatre's identity. The project has also involved the removal of telephone booths by the Tivoli entrance, further streamlining the space and enhancing the overall guest experience.
The Tivoli Foundation's best revenue year yet, achieved through the use of the Soldiers and Sailors Memorial Auditorium, has set a high bar for the new Tivoli Centre. The project has been a testament to the Foundation's ability to navigate the challenges of restoring historic buildings while creating a modern, functional space. However, as Nick Wilkinson, the CEO of the Tivoli Theatre Foundation, learned during the process, "Old buildings resist change."
In conclusion, the Tivoli Centre project has been a remarkable journey, blending the past and present to create a unique cultural hub. It serves as a reminder that restoration is not just about preserving the physical structure but also about understanding and respecting the history and character of the building. As the Tivoli Centre prepares to open its doors, it stands as a shining example of how careful planning, attention to detail, and a commitment to historical preservation can result in a truly exceptional cultural destination.